2017
- Categories:发展历程
- Author:
- Origin:
- Time of issue:2022-04-26
- Views:
(Summary description)• The construction of the Dalian Zhuanghe wind power blade industrialbase project, Phase I of the food cold chain logistics park project (Plot B) of China Railway Tielong Cold Chain Development Co., Ltd., Phase I of the second site leveling project in East Changdao of Jinzhou Economic Development Zone, etc. was commenced
2017
(Summary description)• The construction of the Dalian Zhuanghe wind power blade industrialbase project, Phase I of the food cold chain logistics park project (Plot B) of China Railway Tielong Cold Chain Development Co., Ltd., Phase I of the second site leveling project in East Changdao of Jinzhou Economic Development Zone, etc. was commenced
- Categories:发展历程
- Author:
- Origin:
- Time of issue:2022-04-26
- Views:
• The construction of the Dalian Zhuanghe wind power blade industrialbase project, Phase I of the food cold chain logistics park project (Plot B) of China Railway Tielong Cold Chain Development Co., Ltd., Phase I of the second site leveling project in East Changdao of Jinzhou Economic Development Zone, etc. was commenced
Scan the QR code to read on your phone
Latest News
SEO 辽ICP备2022002751号-1 Powered by www.300.cn
The ownership of the pictures and trademarks on this website are reserved by Dalian Jinwan Construction Group Co., Ltd., which shall not be copied or reprinted without authorization